Search
Close this search box.
  1. Home
  2. /
  3. Cases
  4. /
  5. Russia Krasnodar Port Project,35...

Russia Krasnodar Port Project,35 ton, 25 meters gantry crane for containers-7

November 21, 2024

Share:

Russia’s Krasnodar Port is located in the Siberian region with high latitude, severe cold climate and long winter, the design and selection of the steel structure, mechanism parts and electrical equipment of the crane need to be done during the design. Special considerations enable it to work normally in a low temperature environment of -40°C. During this period, a project team composed of experienced designers and production personnel was specially established to communicate in depth with the Russian side in terms of process design, equipment selection, etc.

Especially regarding the quality of welding, in low-temperature areas, the quality requirements for welding are different from conventional ones. Both welding equipment and welding quality need to consider various factors

Can'tdecide? Fill In Your Requirements Now And Let The Engineers Give You The Mostprofessional Advice!

Quote Now

Leave a message now to get a free detailed quotation list andinformation

Professional Crane Manufacturer Brand

Transparent Quotation

The Most Cost-Effective Crane Manufacturer

Save Money And Worry

Professional Engineercall Back Within Eight Hours

Even You Do Not Have A Requirement,Ask For A Professionalquote For Your Reference And Comparison

Get A Free Quote